News update
  • COP31 Nears Close as ‘Weak’, ‘Compromised’ Draft Draws Fierce Backlash     |     
  • Bangladesh Begins Plan to Modernise Armed Forces: PM     |     
  • Govt Committed to Making Bangladesh a Dignified Nation: PM     |     
  • Rights Groups Urge Sanctions on Myanmar After ICJ Ruling     |     
  • PM Pays Tribute at Shikha Anirban on Armed Forces Day     |     

Adani's Unit-2 resumes supply to Bangladesh grid

Greenwatch Desk Energy 2026-09-13, 4:08pm

images119-6e04558b005ff4921d94561fc5c1bc191789294244.jpg




Power supply to the national grid from Adani Power's Unit-2 of the Godda power plant in Jharkhand of India has resumed at today.


The unit stopped operating due to a technical fault since Thursday midnight, reports UNB.

After repairing the fault, power supply to Bangladesh has started again connecting the 800MW unit with the national grid of Bangladesh at 12.04pm today, said Mohammad Jahurul Islam, member (Generation) of the Bangladesh Power Development Board (BPDB).

Currently, generation from the unit is increasing gradually, he added.