News update
  • Security Council Divided on United States' Venezuela Action     |     
  • Over 1.53m voters register for postal balloting: Shafiqul Alam     |     
  • Bangladesh Bank to liquidate 9 NBFIs in financial sector reforms     |     
  • Govt Moves to Clear Tk20,000cr Dues to Avoid Summer Outages     |     
  • Maduro Pleads Not Guilty in US Court, Claims Presidency     |     

Barapukuria Power Plant shuts down due to mechanical issues

Nation 2025-02-19, 11:44pm

barapukuria-power-plant-shuts-down-due-to-mechanical-issues-d8db1e3b23619b44d1e2bb4cf0c3c70a1739987822.jpg




Dinajpur, 19 Feb – The Barapukuria Power Plant in Dinajpur has completely shut down operations due to multiple mechanical failures, including a boiler leakage, officials said on Wednesday.

Abu Bakkar Siddique, chief engineer of the plant, said, "Since this is a mechanical issue, it is difficult to specify when operations will resume. The necessary equipment for repairs is being procured domestically," he said.

According to him, all three units of the 525MW plant have been shut down due to different technical problems. Unit 1 (125MW) suffered a boiler pipe leakage yesterday, while Unit 3 (275MW) faced a pipe and bearing failure on February 15.

Meanwhile, Unit 2 (125MW) has remained non-operational for several months due to a mechanical fault.