News update
  • BYD Expands Future of New Energy Mobility with Triple-Model Launch in BD     |     
  • High reliance on VAT, AIT fuel inflation, denting investment     |     
  • DMP steps up Eid-ul-Azha security, vows crackdown on crime     |     
  • JUCSU blockade Dhaka-Aricha highway, protest non-arrest of rape suspect     |     
  • ‘Songs of Fired Earth’ Inaugurated at Alliance Francaise     |     

20km tailback on Dhaka-Tangail-Bangbandhu Bridge

News Desk Transportation 2023-06-09, 11:06am

traffif-jam-61afb493ead98d51cf68add8a1d5f0ad1686287196.jpeg

A 20km tailback has been created on Dhaka-Tangail-Bangabandhu Bridge Highway since Thursday midnight.



A 20km tailback has been created on Dhaka-Tangail-Bangabandhu Bridge Highway since Thursday midnight.

Traffic has formed from the east side of Bangabandhu Bridge to Rabana Bypass, causing sufferings for the passengers and drivers.

According to the police and drivers, the pressure of vehicles on the Dhaka-Tangail-Bangabandhu Bridge highway has been increasing since Thursday evening. A Dhaka-bound pickup full of chicken overturned on the road in Madarjani area of Sadar upazila at midnight. At that time, the traffic through the Dhaka-bound lane was stopped. 

On the other hand, the wheel of a Dhaka-bound truck broke down at Kamakshar Mor area of Kalihati upazila. Before the truck could be removed, the traffic jam was caused by the vehicles moving in the opposite direction.

In this regard, Elenga Highway Police Outpost in-charge Zahid Hasan said that on Thursday night, the traffic congestion was caused due to the increased pressure of vehicles and vehicles breaking down at various points on the highway. Police are working to clear the traffic jam. 

He also said that the traffic will become normal as the day progresses.