News update
  • COP31 Nations Push for Fossil Fuel Action, More Finance     |     
  • WFP Seeks $12.1bn to Feed 91 Million People in 2027     |     
  • Bangladesh Crosses 300 LEED-Certified Green Factories     |     
  • COP31 delivers deals for host Turkey as climate diplomacy stalls     |     
  • UNGA President Urges Four Steps for Rohingya Justice     |     

20km tailback on Dhaka-Tangail-Bangbandhu Bridge

News Desk Transportation 2023-06-09, 11:06am

A 20km tailback has been created on Dhaka-Tangail-Bangabandhu Bridge Highway since Thursday midnight.



A 20km tailback has been created on Dhaka-Tangail-Bangabandhu Bridge Highway since Thursday midnight.

Traffic has formed from the east side of Bangabandhu Bridge to Rabana Bypass, causing sufferings for the passengers and drivers.

According to the police and drivers, the pressure of vehicles on the Dhaka-Tangail-Bangabandhu Bridge highway has been increasing since Thursday evening. A Dhaka-bound pickup full of chicken overturned on the road in Madarjani area of Sadar upazila at midnight. At that time, the traffic through the Dhaka-bound lane was stopped. 

On the other hand, the wheel of a Dhaka-bound truck broke down at Kamakshar Mor area of Kalihati upazila. Before the truck could be removed, the traffic jam was caused by the vehicles moving in the opposite direction.

In this regard, Elenga Highway Police Outpost in-charge Zahid Hasan said that on Thursday night, the traffic congestion was caused due to the increased pressure of vehicles and vehicles breaking down at various points on the highway. Police are working to clear the traffic jam. 

He also said that the traffic will become normal as the day progresses.