News update
  • USS Warrior Arrives in Chattogram for CARAT Bangladesh 2026     |     
  • Garment Workers’ Protest Shuts Five Metro Rail Stations     |     
  • Govt Forms Six-Member Wage Board for Garment Workers     |     
  • Dhaka ranks 4th among world's most polluted cities this morning     |     
  • Dhaka Launches Company-Operated Buses on Six Routes Today     |     

Traffic diverted at Karnaphuli Tunnel for maintenance

Greenwatch Desk Transportation 2025-11-26, 8:57am

images125-28b0e5d55180dd0e1219ee13e1fd4c841764125936.jpg




Traffic at the Karnaphuli Tunnel will move through controlled diversion at night from November 25 to 30 due to routine maintenance work, according to a press release of the Ministry of Road Transport and Bridges on Tuesday.


Vehicle movement will be diverted through either the Patenga-to-Anwara or Anwara-to-Patenga tube each night, depending on the work required.

The diversion will remain in place from 11pm to 5am.

Authorities said that passengers may need to wait between five and ten minutes at both ends of the tunnel depending on traffic volume.

Bangladesh Bridges Authority requested public cooperation to complete the maintenance work safely and efficiently, reports UNB.