News update
  • Climate Alarm ‘Blaring’ as Disasters Intensify: UN     |     
  • ‘Top Criminal’ David Emon Held While Fleeing to India     |     
  • Bangladesh Has Only 189 Tigers, Warns State Minister     |     
  • Study Finds Microplastics In Soybean Oil Sold In Dhaka     |     
  • Study Finds Microplastics in 95% of Sugar Samples in Bangladesh      |     

Fire at Shahjibazar power plant plunges Habiganj into darkness

Greenwatch Desk Fire 2025-07-31, 10:57pm

images64-9069713bf4be32a2d071b769293f0bba1753981170.jpg




The entire Habiganj district has been left without electricity as a fire broke out at the 33/11 kV switching station of Shahjibazar Power Plant on Thursday night.


The fire originated from a current transformer (CT) and breaker around 7:30 pm, said Mizan, an employee of the station.

The Fire Service personnel brought the fire under control minutes after the incident, he said.

Power supply through the Palli Bidyut line and Habiganj distribution center remains suspended.

Officials and staff are working to restore electricity, said executive engineer of Habiganj Power Division Manjurul Murshed, adding that it is difficult to say when supply will resume, reports UNB.