News update
  • BIP calls for shift to public transport to ensure energy security     |     
  • Commercial flights resume at Tehran airport after two months     |     
  • 11 more children die of measles, similar symptoms in 24 hrs: DGHS     |     
  • 1,000 runners join ‘Beautiful BD Run Season-2’ at Hathirjheel     |     
  • Revenue Collection Faces Tk98,000 Crore Shortfall     |     

Instead of waiting for WDB, Khulna villagers repair bundh on their own

GreenWatch Desk Nation 2022-07-18, 9:25pm




An embankment which broke under  increased water pressure has been reconstructed by the residents of Khulna’s Koyra upazila to protect houses, land crops, and fish enclosures.

Koyra Upazila Parishad Chairman SM Shafiqul Islam and Upazila Nirbahi Officer Animesh Biswas led the initiative and completed the construction of the ring dam from morning tide to noon tide.

Imtiaz Uddin, general secretary of the Koira development coordination committee, said that about 3,000 people of South Bedkashi union had built the broken 300-meter dam together to ease the sufferings.

The Water Development Board has given some sacks for this work, he added.

Earlier, the embankment started to break on Sunday noon.

According to Osman Gani, a member of the local ward, a road on one side of the Charmukha canal went into the riverbed around 4:00am.

As a result, around 7 to 8 thousand people of five villages have been stranded.

Villagers tried to repair the dam on their own initiative but failed on Sunday. However on Monday they managed to rebuild the dam, reports UNB.