News update
  • Guterres Urges Leaders to Act as UNGA Week Begins     |     
  • BNP to go door to door for hearts and votes     |     
  • Chittagong port tariffs increased up to 50 per cent     |     
  • Rising Heat Cost Bangladesh $1.8 Billion in 2024     |     
  • Stocks extend gains; turnover drops in Dhaka, rises in Ctg     |     

Barapukuria Power Plant shuts down due to mechanical issues

Nation 2025-02-19, 11:44pm

barapukuria-power-plant-shuts-down-due-to-mechanical-issues-d8db1e3b23619b44d1e2bb4cf0c3c70a1739987822.jpg




Dinajpur, 19 Feb – The Barapukuria Power Plant in Dinajpur has completely shut down operations due to multiple mechanical failures, including a boiler leakage, officials said on Wednesday.

Abu Bakkar Siddique, chief engineer of the plant, said, "Since this is a mechanical issue, it is difficult to specify when operations will resume. The necessary equipment for repairs is being procured domestically," he said.

According to him, all three units of the 525MW plant have been shut down due to different technical problems. Unit 1 (125MW) suffered a boiler pipe leakage yesterday, while Unit 3 (275MW) faced a pipe and bearing failure on February 15.

Meanwhile, Unit 2 (125MW) has remained non-operational for several months due to a mechanical fault.